BSCC News

Inspiration

Timetable/Status as of 19 September 2007

 

British Steam Car Appeal

A new website - www.britishsteamcarappeal.co.uk - supporting the project has been launched.

Visit this website to find out how you can be part of history.  By donating £1.00 you can buy a square on the Union Jack displayed on the car. The Union Jack will eventually be transposed onto ‘Inspiration’ and when she rests in Beaulieu Motor Museum the public can look through a magnifying glass and see their name. It can be said that those people placing their names on the car will go also be making the attempt at the Steam Record.  You can read the press release about the project here.

 

Project Update

 

The British Steam Car Challenge – which will attempt to set British and World Land Speed Records in excess of 200mph – received a considerable boost recently when Slough Heat & Power in Berkshire provided some steam from a purpose-built gantry to assist the team in their initial trials. Click here to read full text of press release.

 

The Project also received a big boost when the Challenge was featured in the Motoring section of the Daily Telegraph (21 October 2006).
 

News from our Sponsors

Micro Movements has joined the sponsors list.   Micro Movements has a worldwide reputation for its expertise in Data Acquisition, Signal Conditioning, Recording and Analysis products and their application. The company has instrumented, measured, recorded and finally analysed the results for customers on projects from large structures such as bridges and power pylons through to aircraft structures and jet engines in addition to many different automotive tests. Although based in the United Kingdom, we have distribution outlets in Europe, the Far East and the United States.

 

 

Team Inspiration

 

The next Open Day will be held on Sunday 11 March 2007.  To book for this event, simply complete the booking form and return to the Club Office.  Reports of all the club days are available on the website.

Sales of the Team Inspiration Merchandise are going well, so if you haven't bought your limited edition items, don't forget that it is only available through the Project Office.  To view the lines still available, click here.


Team Inspiration Members are thrilled to learn that their fund-raising activities are being put to good use. The money raised by Club Members is being used to pay for the front end, the nose, of Inspiration to be designed and manufactured. It is the aim of the fund to raise £5,000 and to find out how much is currently in the fund click on this link to the Inspiration Nose Fund. The Team Inspiration Office would like to send a big thank you to Mr David Bartrop, one of Team Inspiration's founder members, has recently sent a cheque for £250 towards the nose cone fund.

 

Boilers


The Steam car boilers are now able to supply a stable, continuous, controlled flow of superheated steam at the correct pressure and temperature. However, the boiler testing has shown a limit in total steam flow. Modifications are being carried out to the boiler designed to increase its capacity. The boiler test program will continue over the next few weeks until our flow rate requirement is met.


Turbines


The turbine rotors and spin test adaptors were balanced by Jim Watson of Schenck at the Rotech Spindle Services facility in Slinfold, West Sussex, early this year.

 

After balancing the adaptors and turbine rotors were assembled and taken to Qinetiq for spin testing.  Successful spin tests up to 15,000 rpm were carried out on both the first and second stage turbines.

 

The turbine rotors have now been fitted into their housings., which in turn have been attached to the final drive unit.

 


Brakes


PDS are continuing their sponsorship of the project by manufacturing the purpose designed brake calipers and associated fittings. The special brake discs and their mounting bells are being manufactured.


Bodywork


Vintage Cars has almost completed the rear aluminium body section. However, we have put it on hold at the moment in case the final modifications to the boiler design result in minor bodywork changes.


Dashboard


SPA has produced a dedicated electronic instrument panel complete with speedometer, rev-counter and warning lights as well as a programmable multi-function digital panel.


Powertrain


The turbine/final drive assembly has now been mounted onto a dynamometer and connected to a test  boiler, ready to commence the running in and power test programme.

 


Pressure Vessels


All of the pressure vessels are now completed and proof tested with the exception of the water tanks, which are being manufactured by CTG.


Chassis and suspension


The rolling chassis is complete and ready to begin the installation of all of the ancillary parts. The rollover safety cage and main chassis frame are prepared and will be completed with the installation of the last boiler and powertrain mounting components, once the boiler testing and dyno tests are completed.

 

Last updated 19 September 2007


(c) 1999-2008, British Steam Car Challenge